Energy & Renewables

Energy & Renewables

Hydropower, Solar, and Power Transmission & Distribution

ICTC has worked with World renowned developers, investors, engineering firms, contractors and equipment vendors in the engineering, construction and supply of major HYDRO POWER and ELECTRIC TRANSMISSION, DISTRIBUTION and SUBSTATION PROJECTS in Nepal. ICTC was involved in many of the government’s generation plants and transmission systems. Our well acknowledged services have extended to all major public undertakings and also include Nepal’s first Independent Power Producer.

Key Services

  • Project identification and license acquisition
  • Feasibility, detailed design, and environmental assessments
  • EPC contract execution for civil and HM works
  • Turnkey contracts for electromechanical equipment
  • Strategic local partnership and fund sourcing

Our Expertise

  • Hydropower Development (up to 900 MW)
  • High Voltage Transmission Lines (up to 220kV)
  • Substation and Switchyard Construction
  • Operation and Maintenance (O&M)

Projects Review

Period / YearProject Details
1980-199669 MW Marsyangdi HEP Civil Works, Hydraulic Steel Structures, Hydromechanical Equipment, Training, including sourcing of fund
1992Trishuli HEP Rehab Works
1992-1995402 MW Arun-3 HEP Feasibility Study, Detailed Engineering Design
1993Kulekhani Storage HEP Emergency Rehab Civil Works
199660 MW Khimti I HEP Electromechanical Equipment
1997-2004144 MW Kali Gandaki A HEP Hydraulic Steel Structures, Hydromechanical and Electromechanical Equipment, Transmission Line and Substations, Operation and Maintenance
2000& 2005 27 MW Khimti II HEP Feasibility Study and Survey License
2001-200872 MW Marsyangdi HEP Civil Works, Hydraulic Steel Structures, Hydromechanical and Electromechanical Equipment, including sourcing of funds
2007-202230 MW Chameliya HEP Hydromechanical and Electromechanical Equipment, Transmission Line and Substations, including arrangement of sourcing of funds
2011-2018750MW West Seti Storage Investment (License)

Project Gallery

69 MW Lower Marsyangdi HEP (MMHEP)

Hydraulic steel structures for Lower Marsyangdi HEP
Hydraulic steel structures for Lower Marsyangdi HEP
Lower Marsyangdi HEP control panel
Lower Marsyangdi HEP control panel
69 MW Lower Marsyangdi Hydroelectric Project
69 MW Lower Marsyangdi Hydroelectric Project
Lower Marsyangdi HEP intake valve
Lower Marsyangdi HEP intake valve
Lower Marsyangdi HEP trifurcation
Lower Marsyangdi HEP trifurcation
Lower Marsyangdi HEP Francis turbine
Lower Marsyangdi HEP Francis turbine
Hydromechanical systems for Lower Marsyangdi HEP
Hydromechanical systems for Lower Marsyangdi HEP
Steel structures installation at Lower Marsyangdi HEP
Steel structures installation at Lower Marsyangdi HEP

Gallery Image View

Melamchi Water Supply Project

170 MLD Melamchi Water Supply Project
170 MLD Melamchi Water Supply Project

Gallery Image View

Middle Marsyangdi Water Component

Middle Marsyangdi project related to water supply
Middle Marsyangdi project related to water supply

Gallery Image View

402 MW Arun-3 HEP Studies

402 MW Arun-3 HEP Model Testing
402 MW Arun-3 HEP Model Testing
402 MW Arun-3 HEP Feasibility Study
402 MW Arun-3 HEP Feasibility Study

Gallery Image View

60 MW Khimti 1

60 MW Khimti 1 hydroelectric project
60 MW Khimti 1 hydroelectric project
Khimti 1 project overview
Khimti 1 project overview

Gallery Image View

Irrigation Sub-Projects

Public hearing in Dharan for irrigation project
Public hearing in Dharan for irrigation project
Drilling site for water supply project
Drilling site for water supply project
Stakeholder meeting for irrigation project
Stakeholder meeting for irrigation project
Lab test of geotechnical works for irrigation project
Lab test of geotechnical works for irrigation project

Gallery Image View

General Substation Views

Substation construction
Substation construction
Substation equipment installation
Substation equipment installation
View of Attariya substation work
View of Attariya substation work

Gallery Image View

Kali Gandaki A GIS Switchgear

132kV GIS Switchgear Kali Gandaki A HEP
132kV GIS Switchgear Kali Gandaki A HEP

Gallery Image View

144 MW Kali Gandaki A Hydroelectric Project

Kali Gandaki A HEP control panel
Kali Gandaki A HEP control panel
Kali Gandaki A HEP runner turbine
Kali Gandaki A HEP runner turbine
Kali Gandaki A HEP generator equipment
Kali Gandaki A HEP generator equipment
Kali Gandaki A HEP hydraulic steel structures
Kali Gandaki A HEP hydraulic steel structures
Kali Gandaki A HEP hydraulic systems
Kali Gandaki A HEP hydraulic systems
Kali Gandaki A HEP steel structures installation
Kali Gandaki A HEP steel structures installation
Kali Gandaki A HEP rotor assembly
Kali Gandaki A HEP rotor assembly
Kali Gandaki A HEP stator transportation
Kali Gandaki A HEP stator transportation
Kali Gandaki A HEP Francis turbines
Kali Gandaki A HEP Francis turbines
Kali Gandaki A HEP structural systems
Kali Gandaki A HEP structural systems
Kali Gandaki A HEP steel gates installation
Kali Gandaki A HEP steel gates installation
144 MW Kali Gandaki A Hydroelectric Project
144 MW Kali Gandaki A Hydroelectric Project
Kali Gandaki A HEP powerhouse view
Kali Gandaki A HEP powerhouse view
Kali Gandaki A HEP turbine installation
Kali Gandaki A HEP turbine installation
Kali Gandaki A HEP turbine parts transportation
Kali Gandaki A HEP turbine parts transportation
Kali Gandaki A HEP damsite HVAC system
Kali Gandaki A HEP damsite HVAC system
Kali Gandaki A HEP hydraulic systems installation
Kali Gandaki A HEP hydraulic systems installation
Kali Gandaki A HEP draft tube
Kali Gandaki A HEP draft tube

Gallery Image View

72 MW Middle Marsyangdi HEP (Equipment)

Middle Marsyangdi HEP electrical equipment layout
Middle Marsyangdi HEP electrical equipment layout
Middle Marsyangdi HEP generator installation
Middle Marsyangdi HEP generator installation
Middle Marsyangdi HEP control panel
Middle Marsyangdi HEP control panel
Middle Marsyangdi HEP stator frame preassembly
Middle Marsyangdi HEP stator frame preassembly
Middle Marsyangdi HEP dovetail bar installation
Middle Marsyangdi HEP dovetail bar installation
Middle Marsyangdi HEP rotor insertion
Middle Marsyangdi HEP rotor insertion
Middle Marsyangdi HEP thrust bearing installation
Middle Marsyangdi HEP thrust bearing installation
Middle Marsyangdi HEP stator air guide installation
Middle Marsyangdi HEP stator air guide installation
Middle Marsyangdi HEP stator winding preparation
Middle Marsyangdi HEP stator winding preparation
Middle Marsyangdi HEP unit 2 installation
Middle Marsyangdi HEP unit 2 installation
72 MW Middle Marsyangdi Hydroelectric Project
72 MW Middle Marsyangdi Hydroelectric Project
Middle Marsyangdi HEP systems installation
Middle Marsyangdi HEP systems installation
Middle Marsyangdi HEP rotor core pressing
Middle Marsyangdi HEP rotor core pressing
Middle Marsyangdi HEP instrumentation installation
Middle Marsyangdi HEP instrumentation installation
Middle Marsyangdi HEP unit 1 installation
Middle Marsyangdi HEP unit 1 installation
Middle Marsyangdi HEP electrical equipment overview
Middle Marsyangdi HEP electrical equipment overview
Middle Marsyangdi HEP spiral casing
Middle Marsyangdi HEP spiral casing
Middle Marsyangdi HEP stator core pressing
Middle Marsyangdi HEP stator core pressing
Middle Marsyangdi HEP project overview
Middle Marsyangdi HEP project overview
Middle Marsyangdi HEP stator winding work
Middle Marsyangdi HEP stator winding work
Middle Marsyangdi HEP Francis turbine testing
Middle Marsyangdi HEP Francis turbine testing
Middle Marsyangdi HEP CO2 system
Middle Marsyangdi HEP CO2 system

Gallery Image View

30 MW Chameliya HEP Equipment

Chameliya HEP electrical and hydromechanical equipment
Chameliya HEP electrical and hydromechanical equipment
30 MW Chameliya HEP 132 kV Transmission Line
30 MW Chameliya HEP 132 kV Transmission Line
Chameliya HEP equipment installation
Chameliya HEP equipment installation
Chameliya HEP mechanical equipment
Chameliya HEP mechanical equipment
Chameliya HEP electrical systems
Chameliya HEP electrical systems
Chameliya HEP project equipment
Chameliya HEP project equipment
Chameliya HEP installation work
Chameliya HEP installation work
Chameliya HEP technical equipment
Chameliya HEP technical equipment
Chameliya HEP systems installation
Chameliya HEP systems installation
Chameliya HEP equipment overview
Chameliya HEP equipment overview
Chameliya HEP installation progress
Chameliya HEP installation progress

Gallery Image View

750 MW West Seti Storage HEP

750 MW West Seti Storage Hydroelectric Project
750 MW West Seti Storage Hydroelectric Project
Map of 750 MW West Seti Storage Hydroelectric Project
Map of 750 MW West Seti Storage Hydroelectric Project
West Seti Storage HEP overview
West Seti Storage HEP overview

Gallery Image View

Projects Review

Period / YearProject Details
2007-Ongoing900 MW Upper Karnali HEP Complete Project cycle including Project Development and License through competitive bidding
2004-2022456 MW Upper Tamakoshi HEP Feasibility Study, Detailed Design and Construction Supervision
2016-2022140 MW Tanahu HEPP Consulting (Supervision)
-250 MW Upper Arun HEP Engineering Works
-14 MW Modi Khola Electromechanical Equipment
2016-2025111 MW Rasuwagadhi HEP Civil Works and HM EPC
2016-2022101 MW Mid-Bhotekoshi HEP Consulting (Supervision)
2016-201887-100 MW Tamakoshi V Consulting (Design)
2016-201822.5 MW Rolwaling Consulting (Design)
2020-2024Humla-Karnali (62 MW) Feasibility & EIA Study

Project Gallery

900 MW Upper Karnali HEP

900 MW Upper Karnali Hydroelectric Project map
900 MW Upper Karnali Hydroelectric Project map
Upper Karnali HEP project map
Upper Karnali HEP project map
900 MW Upper Karnali Hydroelectric Project
900 MW Upper Karnali Hydroelectric Project

Gallery Image View

102 MW Middle Bhotekoshi HEP

Raft concrete work in auxiliary powerhouse at Middle Bhotekoshi HEP
Raft concrete work in auxiliary powerhouse at Middle Bhotekoshi HEP
Excavation at headworks of Middle Bhotekoshi HEP
Excavation at headworks of Middle Bhotekoshi HEP
Map of 102 MW Middle Bhotekoshi Hydroelectric Project
Map of 102 MW Middle Bhotekoshi Hydroelectric Project
Concreting in powerhouse at Middle Bhotekoshi HEP
Concreting in powerhouse at Middle Bhotekoshi HEP
Headworks excavation at Middle Bhotekoshi HEP
Headworks excavation at Middle Bhotekoshi HEP

Gallery Image View

32 MW Kulekhani II Restoration

Kulekhani II Storage Hydropower Station restoration
Kulekhani II Storage Hydropower Station restoration
Kulekhani II emergency restoration work
Kulekhani II emergency restoration work

Gallery Image View

456 MW Upper Tamakoshi HEP

Upper Tamakoshi HEP construction at Lamabagar Plain
Upper Tamakoshi HEP construction at Lamabagar Plain
Upper Tamakoshi HEP construction progress
Upper Tamakoshi HEP construction progress
Upper Tamakoshi HEP tunnel construction
Upper Tamakoshi HEP tunnel construction
Upper Tamakoshi HEP construction site
Upper Tamakoshi HEP construction site
Upper Tamakoshi HEP ongoing construction
Upper Tamakoshi HEP ongoing construction
Upper Tamakoshi HEP development
Upper Tamakoshi HEP development
Upper Tamakoshi HEP infrastructure
Upper Tamakoshi HEP infrastructure
Upper Tamakoshi HEP intake area construction
Upper Tamakoshi HEP intake area construction
Upper Tamakoshi HEP Gongar aerial view
Upper Tamakoshi HEP Gongar aerial view
Upper Tamakoshi HEP project development
Upper Tamakoshi HEP project development

Gallery Image View

140 MW Tanahu Storage HEP

140 MW Tanahu Storage Hydroelectric Project
140 MW Tanahu Storage Hydroelectric Project
Tanahu Storage HEP construction
Tanahu Storage HEP construction

Gallery Image View

14 MW Modi Khola HEP Powerhouse

14 MW Modi Khola HEP Powerhouse
14 MW Modi Khola HEP Powerhouse

Gallery Image View

111 MW Rasuwagadhi HPP

Rasuwagadhi HPP EPC contract works
Rasuwagadhi HPP EPC contract works
Rasuwagadhi HPP headwork construction
Rasuwagadhi HPP headwork construction
Rasuwagadhi HPP tunnel and headwork
Rasuwagadhi HPP tunnel and headwork

Gallery Image View

Rolwaling Diversion Project

Rolwaling Diversion Project detailed design
Rolwaling Diversion Project detailed design

Gallery Image View

Environment Management Programme

Environment Management Programme for Melamchi
Environment Management Programme for Melamchi
Environment Management Programme, Halde Canal at Timbu
Environment Management Programme, Halde Canal at Timbu

Gallery Image View

62 MW Humla Karnali HEP Study

62 MW Humla Karnali Hydroelectric Project Feasibility Study
62 MW Humla Karnali Hydroelectric Project Feasibility Study

Gallery Image View

Projects Review

Period / YearProject Details
2020-2026Bharbhung Storage (512MW) Feasibility & EIA Study
2020-2024Tatu ROR Project (10 MW) Feasibility & EIA Study
2016-2018186MW Tamakoshi-3 ESIA + Feasibility Study
2016-2018186MW Tamakoshi-3 Power Access Study
1983132 KV Dumkibas – Butwal TL and SS
1984132 KV Kulekhani – Kathmandu TL
1984, 1987 132 KV Butwal – Nepalgunj TL
1989, 1991 132 KV Nepalgunj – Mahendranagar TL and SS
1990s Rehab of Karnali (Transmission) Network
1990s 132kV Hetauda – Gandak TRL

Project Gallery

512 MW Bharbung Storage HEP

512 MW Bharbung Storage Hydroelectric Project Feasibility Study
512 MW Bharbung Storage Hydroelectric Project Feasibility Study

Gallery Image View

132 kV Transmission Lines (Far West)

132 kV Transmission Line Nepalgunj-Mahendranagar
132 kV Transmission Line Nepalgunj-Mahendranagar
132 kV Transmission Lines and Substation Butwal-Nepalgunj
132 kV Transmission Lines and Substation Butwal-Nepalgunj

Gallery Image View

Solu Hydroelectric Project

Solu hydroelectric project
Solu hydroelectric project

Gallery Image View

Dumkibas High Voltage Substation

Dumkibas High Voltage Substation
Dumkibas High Voltage Substation

Gallery Image View

132 kV Kohalpur Substation

132 kV Substation at Kohalpur
132 kV Substation at Kohalpur

Gallery Image View

Bhaktapur 132kV Substation

Bhaktapur 132 kV Substation
Bhaktapur 132 kV Substation

Gallery Image View

132 kV Chameliya HPP Transmission Line

132 kV Transmission Line for 30 MW Chameliya HPP
132 kV Transmission Line for 30 MW Chameliya HPP

Gallery Image View

132 kV Chandranigahpur Substation

132 kV Substation Chandranigahpur
132 kV Substation Chandranigahpur
Chandranigahpur substation infrastructure
Chandranigahpur substation infrastructure

Gallery Image View

132 kV Transmission Line

132 kV transmission line installation
132 kV transmission line installation

Gallery Image View

132 kV Lamusangu Substation

132 kV Lamusangu Substation
132 kV Lamusangu Substation

Gallery Image View

Projects Review

Period / YearProject Details
1990s 132kV Kulekhani II – Kathmandu TRL
199066 KV Dipayal – Atarriya TL
1996132 KV Khimti – Bhaktapur TL
1998132 KV Kali Gandaki – Pokhara – Kathmandu TL
2006220 KV Khimti – Dhalkebar TL
2006132 KV Chandranigapur SS
2008132kV Chameliya - Attariya TRL+SS
2011132 KV Butwal – Kohalpur SS
2011132 KV Upper Trisuli – Kathmandu TL
2018220 kV Tamakoshi-Kirne TRL

Project Gallery

Lekhnath Switchyard

132 kV Transmission Lines and Substation Lekhnath Switchyard
132 kV Transmission Lines and Substation Lekhnath Switchyard

Gallery Image View

Lekhnath Switchyard for KGA HEP

Lekhnath switchyard for KGA HEP
Lekhnath switchyard for KGA HEP

Gallery Image View

220 kV Koshi Corridor Transmission Line

Tower stringing for Koshi Corridor Transmission Line
Tower stringing for Koshi Corridor Transmission Line
Foundation and towers for Koshi Corridor Transmission Line
Foundation and towers for Koshi Corridor Transmission Line
Transmission line tower stringing work
Transmission line tower stringing work
Koshi Corridor Transmission Line construction
Koshi Corridor Transmission Line construction
Transmission line foundation work
Transmission line foundation work
Koshi Corridor tower foundation
Koshi Corridor tower foundation
Transmission line infrastructure development
Transmission line infrastructure development

Gallery Image View

220 kV Khimti-Dhalkebar Transmission Line

220 kV Khimti-Dhalkebar Transmission Line construction
220 kV Khimti-Dhalkebar Transmission Line construction
Khimti-Dhalkebar transmission line infrastructure
Khimti-Dhalkebar transmission line infrastructure
220 kV transmission line development
220 kV transmission line development
Transmission line tower installation
Transmission line tower installation
Khimti-Dhalkebar line construction progress
Khimti-Dhalkebar line construction progress

Gallery Image View

Upper Trishuli 3A 220kV Transmission Line

Upper Trishuli 3A 220kV transmission line
Upper Trishuli 3A 220kV transmission line
Upper Trishuli transmission line construction
Upper Trishuli transmission line construction
Upper Trishuli 3A line infrastructure
Upper Trishuli 3A line infrastructure
Upper Trishuli transmission project
Upper Trishuli transmission project

Gallery Image View

Projects Review

Period / YearProject Details
2018220 kV Butwal-Kohalpur 2nd Ckt TRL
2021220 kV Koshi Corridor TRL
-Nationwide Hydropower MasterPlan Engineering
-NEA – Twinning & Corporate Planning
-NEA – Design & Implementation of NEA Training Facilities
-NEA – Long Run Marginal Study
-NEA – Transmission Line Master Plan
-NEA – Generation Master Plan, Distribution Master Plan
-NEA – Transmission Line Consulting Services
-NEA – Feasibility of Chilime-Trishuli TRL 132kV

Project Gallery

99.8 MW Tamakoshi V Hydroelectric Project

Tamakoshi V Hydroelectric Project detailed design
Tamakoshi V Hydroelectric Project detailed design
Tamakoshi V project planning
Tamakoshi V project planning

Gallery Image View

30 MVA Transformer Dubahi Substation

30 MVA Transformer Dubahi Substation
30 MVA Transformer Dubahi Substation

Gallery Image View

Interested ?

Let's discuss how we can help bring your project to life with our expertise and experience.